Indian Gaming Trade Show & Convention

San Diego Convention Center

Monday, March 31 - Thursday, April 3, 2025

Order GES Services by Monday, March 10 for Best Pricing

Plumbing, Air, Water and Gas

Plumbing Labor
Thumbnail
Plumbing Labor, Floor Plan Required
Starting at $166.75
Water: 1/2" and 3/4"
Thumbnail
1st Water Outlet
$898.00
Thumbnail
Water Outlet, Supplemental (within 10' of 1st outlet)
$491.00
Thumbnail
Water Outlet, Connection
$324.25
Drain: 1/2" and 3/4"
Thumbnail
1st Drain Outlet
$898.00
Thumbnail
Drain Outlet, Connection
$324.25
Thumbnail
Drain Outlet, Supplemental (within 10' of 1st outlet)
$491.00
Water Filling and Draining
Thumbnail
Fill & Drain, 1-199 Gallons, 1 Time
$674.50
Thumbnail
Fill & Drain, 200-399 Gallons, 1 Time
$990.50
Thumbnail
Fill & Drain, 400+ Gallons, 1 Time
$1,289.25
Compressed Air: 90-100 lbs PSI
Thumbnail
1st Air Outlet
$898.00
Thumbnail
Air Outlet, CFM requirements (minimum 5 CFM per outlet - price is per CFM)
$33.75
Thumbnail
Air Outlet/Connection
$324.25
Thumbnail
Air Outlet, Supplemental
$448.00
Bottled Gases
Thumbnail
Compressed Nitrogen Cylinder
$410.75
Thumbnail
Regulator, Cylinder Gas
$308.50
Thumbnail
Natural Gas Outlet, Connection
$444.75
Thumbnail
Natural Gas Outlet
$1,371.50

For GES Cancellation Policy, click here.

GES' liability for any and all loss or damage is limited to the value of the cost of plumbing services provided or the depreciated value of Goods, whichever is less.