International Beauty Show – Las Vegas

Las Vegas Convention Center

Sunday, June 25 - Monday, June 26, 2023

The deadline to order for this Show has already expired

Hanging Sign Information

Please order Hanging Signs by the Friday, June 2, 2023 deadline date. By ordering in advance you will help us assure your sign is properly assembled and installed.

GES is responsible for assembly, installation and removal of all hanging signs. Please contact GES at HangingSignsandRigging@ges.com.

  • All signs must be designed to comply with Show Organizer rules and regulations and facility limitations.
  • Make sure all signs, with the exception of cloth and vinyl banners, have structurally engineered rigging points as well as blueprints displaying a current structural engineer’s stamp.
  • If your sign requires electricity, make sure it is in working order and in accordance with the National Electric Code.
  • Include Showsite Exhibitor contact information with the order.
  • Include engineer-stamped drawings with hanging instructions as well as a set of assembly instructions (placement/orientation) with the order. GES accepts no liability for any work completed without such instructions, when required. Work is done at Exhibitor’s risk and Exhibitor shall indemnify and defend GES and Show Organizer from any claims arising out of or related to the installation or dismantle of any sign without approved drawings.

Does your High Lift require Electrical Labor?

  • Does your sign weigh over 250lbs?
  • Does your sign have a rotator?
  • Does your sign have any electrical components?
If you answer "yes" to any of these questions, your sign is electrical and will need to select Labor and Materials Elec as your labor type. Any sign weighing over 250lbs must be installed by electricians and will require a hoist motor. Be sure to order electrical power for your sign.


Truss and Hoists

GES is responsible for assembly, installation, and removal of all truss.

If you wish your representative to be present during the assembly, installation, and removal of your truss, please contact GES at HangingSignsandRigging@ges.com.
  • All truss must be designed to comply with Show Organizer rules and regulations and facility limitations.
  • All truss must be from a recognized manufacturer. Manufacturer load specifications for your truss must be at show site prior to rigging.
  • Climbing on truss is strictly prohibited.
  • All lamps and fixtures to be attached to truss must be in good working order and in compliance with the National Electric Code.
  • All hoists must be from a recognized manufacturer and must be in good working order.
  • Hoist maintenance records should be available for inspection by GES.


Shipping Instructions

Hanging signs should be received in the advance warehouse by Friday, June 16, 2023. Please ship all hanging signs in a separate container with the special sign label provided on the Labels page. Mark bill of lading "Hanging Sign." Prepay all shipments. Collect shipments will not be accepted.

Reminder: To receive the discount price, you must complete and submit the following by Friday, June 2, 2023. Any order received incomplete, rates will be changed to reflect when the complete order has been received, Regular and Show site rates may apply.

  • High Lift for Hanging Signs/Rigging Labor Order MUST be ordered
  • Must ship Hanging Sign to Advanced Receiving by Friday, June 16, 2023
  • Must supply Hanging Sign Instructions and Layout
  • Payment and Credit Card Charge Authorization