The 2026 ASPHO Conference

Minneapolis Convention Center

Thursday, April 30 - Friday, May 1, 2026

Order GES Services by Thursday, April 9 for Best Pricing

Hanging Sign Information

Please order Hanging Signs by the Thursday, April 9, 2026 deadline date. By ordering in advance you will help us assure your sign is properly assembled and installed.

GES is responsible for assembly, installation and removal of all hanging signs.

  • All signs will be reviewed for structural integrity pre-show show and during installation. Signs deemed unsafe will be denied installation.
  • GES reserves the right to request a stamped engineered drawing.
  • The installation of signs weighing 250 lbs. or more may require the use of an additional high lift, and or hoists.
  • All signs must be designed to comply with Show Organizer rules and regulations and facility limitations.
  • Make sure all signs, with the exception of cloth and vinyl banners, have structurally engineered rigging points as well as blueprints displaying a current structural engineer's stamp.
  • If your sign requires electricity, make sure it is in working order and in accordance with the National Electric Code.
  • Include Showsite Exhibitor contact information with the order.
  • Include engineer-stamped drawings with hanging instructions as well as a set of assembly instructions (placement/orientation) with the order. GES accepts no liability for any work completed without such instructions, when required. Work is done at Exhibitor's risk and Exhibitor shall indemnify and defend GES and Show Organizer from any claims arising out of or related to the installation or dismantle of any sign without approved drawings.


Truss and Hoists

GES is responsible for assembly, installation, and removal of all truss.

If you wish your representative to be present during the assembly, installation, and removal of your truss, please contact GES at HangingSignsandRigging@ges.com.

  • All truss must be designed to comply with Show Organizer rules and regulations and facility limitations.
  • All truss must be from a recognized manufacturer. Manufacturer load specifications for your truss must be at show site prior to rigging.
  • Climbing on truss is strictly prohibited.
  • All lamps and fixtures to be attached to truss must be in good working order and in compliance with the National Electric Code.
  • All hoists must be from a recognized manufacturer and must be in good working order.
  • Hoist maintenance records should be available for inspection by GES.


Shipping Instructions

All hanging signs should be received in advance at the GES Warehouse by Friday, April 24, 2026. Please ship all hanging signs in a separate container with the special shipping label - see Shipping Labels. Mark Bill of Lading "Hanging Sign." Prepay all shipments. Collect shipments will not be accepted. Please call for information on advance shipping for all uncrateable signs.

Reminder: To receive the discount price, you must complete and submit the following by Thursday, April 9, 2026. Any order received incomplete, rates will be changed to reflect when the complete order has been received, Regular and Show site rates may apply.

  • High Lift for Hanging Signs/Rigging Labor Order
  • Must ship Hanging Sign to Advanced Receiving
  • Must supply Hanging Sign Layout and Instructions
  • Payment and Credit Card Charge Authorization


Helpful Ordering Tips

  1. Order by the Discount Deadline Date to save! Be sure to submit payment along with your order on or before the deadline to secure Discount pricing.
  2. Be sure to complete the following information below to avoid delays or additional cost:
    • Send your sign to the GES advance warehouse. Please have the sign in its own container or box separate from your other freight and clearly labeled HANGING SIGN.
    • Make sure you are providing the correct dimensions and weight of your sign.
    • Elevation - what is your desired elevation of your sign (Number of feet from floor to top of the sign) This must follow the Show Organizer rules and regulations.
    • Is your sign electrical or non-electrical? (Rotating motors are considered electrical signage)
    • Pick Points - number of structural pick points on the sign.
    • Floorplan - you must submit a floorplan indicating placement of your sign within the booth to include adjacent booth numbers for orientation.
    • Approval - When applicable, make sure you have submitted for approval to show management/ GES. This information will be stipulated in the GES online ordering site/Show Management tab.
    • Select a date and time for installation/removal of your sign. You also have the option to select "OK to Proceed" without your supervision. Completed instructions, sign delivered to our advance warehouse and all hardware must be provided, and GES’ goal will be to hang your sign prior to your arrival or selected date and time.
  3. Structural Engineered drawings - if applicable or requested by GES, you may need to provide a stamped drawing indicating the weight and location of the rigging points. GES reserves the right to not hang any signage/structure that in our opinion is not deemed structurally sound.