North American Commercial Vehicle Show

Georgia World Congress Center

Monday, October 28 - Thursday, October 31, 2019

The deadline to order for this Show has already expired

Hanging Sign Information

Please order Hanging Signs/Truss Labor by Thursday, October 3, 2019.

By sending us this information in advance you will help us assure your sign is properly assembled and installed.

Hanging Signs

GES is responsible for assembly, installation, and removal of all hanging signs.
  • All signs must be designed to comply with Show Organizer rules and regulations and facility limitations.
  • Make sure all signs, with the exception of cloth banners and signs under 100 lbs., have structurally engineered rigging points as well as blueprints displaying a current structural engineer's stamp.
  • If your sign requires electricity, make sure it is in working order and in accordance with the National Electric Code.
  • Include show site Exhibitor contact information with the order.
  • Include engineer-stamped drawings with hanging instructions as well as a set of assembly instructions (placement/ orientation) with the order. GES accepts no liability for any work completed without such instructions, when required. Work is done at Exhibitor's risk and Exhibitor shall indemnify and defend GES and Show Organizer from any claims arising out of or related to the installation or dismantle of any sign without approved drawings.

Truss and Hoists

GES is responsible for assembly, installation, and removal of all truss.
  • All truss must be designed to comply with Show Organizer rules and regulations as well as facility limitations.
  • All truss must be from a recognized manufacturer. Manufacturer load specifications for your truss must be at show site prior to rigging.
  • Climbing on truss is strictly prohibited.
  • All lamps and fixtures to be attached to truss must be in good working order and in compliance with the National Electric Code.
  • All hoists must be from a recognized manufacturer and must be in good working order.
  • Hoist maintenance records should be available for inspection by GES.