Bronner Bros International Beauty Show

Georgia World Congress Center - Hall C1 - C3

Saturday, August 19 - Monday, August 21, 2017

The deadline to order for this Show has already expired

Target Move-In and Freight Information

All inbound exhibit material and equipment is specifically targeted by booth number. Please refer to TARGET/SCHEDULED ASSIGNMENTS contained in this section.

Remember: Missed Target freight will be billed a $50.00 minimum fee, if not scheduled by Friday, August 4, 2017.

DO NOT ALLOW YOUR CARRIER TO BLOCK YOUR "ON-TARGET" FREIGHT WITH OFF-TARGET FREIGHT
AS THE ENTIRE LOAD MAY BE RESCHEDULED.

Your TARGET/SCHEDULED ASSIGNMENT is designed to be the point at which direct deliveries may begin checking in at the Marshaling Yard. It is not the point at which set-up should be scheduled.

Freight shipped through our warehouse will be delivered prior to the beginning of your assigned target date and time. Please refer to the Key Installation Move-In/Outbound Move-Out Schedule for more information.

Every attempt will be made to accommodate all inbound deliveries within their targeted day. However, there can be NO GUARANTEES with respect to absolute delivery dates and times.

Route your shipments carefully. Utilize only carriers who provide bills of lading and can be contacted at any point in time.

Insure your material from the time it leaves your facility until it is returned.

The target/scheduled assignments are intended for your general planning purposes. We recommend scheduling installation labor to begin the day after your inbound target assignment.

NOTE: All exhibitor crates must be emptied and labeled for removal by the time specified in the Freight Timetable of Operations.

EXCEPTIONS: Exhibitors listed as Last in First Out. POV deliveries - Please see POV Load-In/Load-Out Procedures as a specially designed time has been set aside for the delivery of small personal operated vehicles.


It remains the exhibitors' responsibility to ensure that their freight is loaded to accommodate the INBOUND TARGET/SCHEDULED ASSIGNMENTS.

PLEASE PLAN CAREFULLY.

Off-target freight and equipment may be refused and/or rescheduled.

Missed target/scheduled freight and equipment may be rescheduled by appointment only. Please refer to Key Installation Move-In/Outbound Move-Out Schedule.

Please Contact Us if you have any questions.